Award of Merit — Safety: Suncoast Parkway 2, Phase 2A

The hazard profile on this project was substantial, with five bridge structures, 2.5 million cu yd of excavation, 10,000 linear ft of steel pipe pile-driving and asphalt paving.

Source: New feed


Leave a Reply