Lendlease (US) Construction LMB Inc. surmounted both construction and safety challenges with the Pfizer Plasmid DNA – Suites GH project in Andover, Mass.
Source: New feed
Lendlease (US) Construction LMB Inc. surmounted both construction and safety challenges with the Pfizer Plasmid DNA – Suites GH project in Andover, Mass.
Source: New feed
The new school, which has 1,360 students, was designed to support a STEAM-based curriculum that includes “learning pods, flexible project areas, makerspaces and tech shops including a woodshop, broadcast studio, coding and web/graphic design lab and 3D design and computer-aided design labs,” according to the project team.
Source: New feed
While replacing the existing 15-ft-long concrete slab bridge for this $7.2-million project, the team faced challenges that included compressible soils and tidal conditions. Because a sealed cofferdam was not employed, all work was conducted during 8-ft tidal cycles.
Source: New feed
Thousands of Deere workers with the UAW voted on Nov. 17 to end the monthlong strike that had disrupted the equipment manufacturer’s operations at over a dozen facilities.
Source: New feed
At this point, well into the era of working with COVID-19, questions over remote work, remote collaboration and better awareness of the workforce on construction jobsites can seem like settled issues.
Source: New feed
Reconstructing a busy roadway is tough under any circumstances. But undertaking such a major project at Logan International Airport, where hundreds of thousands of passengers arrive and depart each week in cars and buses, presented a host of challenges.
Source: New feed
This 45,000-sq-ft, $30.5-million project includes flexible classrooms, huddle spaces, makerspace and a sports lab for instruction and competition.
Source: New feed
With a construction schedule developed around the Endicott College’ academic calendar, detailed coordination and meticulous schedule management were critical on the $44.5-million Samuel C. Wax Academic Center.
Source: New feed
One of the first large-scale multifamily Passive House-certified developments in Massachusetts, this $34.2-million project was also the largest new multifamily affordable housing projects in Cambridge in 40 years.
Source: New feed
The team preserved and restored the iconic Indiana limestone exterior of this 350,00-sq-ft, 1931-era Hartford, Conn. landmark with Art Deco features while the interior was fully gutted and renovated to create a modern office layout for state employees.
Source: New feed