Sustainability was top of mind for county officials and their project team working on this $195-million mass timber office building.
Source: New feed
Sustainability was top of mind for county officials and their project team working on this $195-million mass timber office building.
Source: New feed
Building over a D.C. Metro tunnel challenged the Bard High School Early College project team, who transformed a former elementary school into an institution dedicated to increasing higher education access for low-income and underrepresented communities by providing a free college program.
Source: New feed
The team working on the project to expand a top-rated Mayo Clinic facility in Phoenix performed extensive prefabrication work that allowed the hospital not only to avoid disruptions to patient care by remaining open during construction but also shaved months off the schedule.
Source: New feed
Planning and constructing a 128-ft-tall, 139-ft-long, 62-ft-wide, 2,800-ton cracking furnace, then transporting it a mile before carefully connecting it was a puzzle that took some out-of-the-box thinking and next-level coordination.
Source: New feed
Sitting vacant for decades, the Endicott Johnson Victory Shoe Factory had deteriorated into an eyesore before the team returned it to a symbol of local pride and prosperity.
Source: New feed
Building a climate-controlled warehouse and logistics facility for United Therapeutics in North Carolina’s Research Triangle was a matter of power management and careful planning.
Source: New feed
Reconstruction of the 1940s-era Spellacy covered bridge—one of America’s largest at 300 ft long and 24 ft wide—had a small price tag of $9.5 million but delivered a big impact.
Source: New feed
Engineering is already the fastest-growing field of study at the University of Nevada, Las Vegas, but its $73-million Advanced Engineering Building, which opened for classes last fall, could make more students change majors.
Source: New feed
At the outset of a 1.6-mile, multimillion-dollar Phase II light rail extension project in Phoenix, representatives from project owner Valley Metro Rail, Kiewit-McCarthy, Jacobs and other consultants convened to brainstorm value engineering ideas.
Source: New feed
Brasfield & Gorrie was able to safely execute simultaneous construction of a 26-story office tower, 26-story residential tower and 14-story hotel on a tight site in urban Atlanta.