Concrete Monitoring Speeds London Airport Expansion

At the King George the Fifth dock site on the River Thames, a contractor is using smart sensors to monitor the strength of concrete it’s casting to form 75,000 sq meters of slab over water to extend the footprint of London City Airport.

Source: New feed


Leave a Reply