A groundbreaking was held in April for the 395,000-sq-ft center, which is expected to enable the university to increase admission of engineering students by 1,000 a year.
Source: New feed
A groundbreaking was held in April for the 395,000-sq-ft center, which is expected to enable the university to increase admission of engineering students by 1,000 a year.
Source: New feed