The school spans 60,000m2, and includes a swimming pool, play area and multipurpose hall
The post ASGC wins $27.7m Phase 2 of Arada’s SABIS International School at Aljada appeared first on Construction Week Online.
Source: New feed
The school spans 60,000m2, and includes a swimming pool, play area and multipurpose hall
The post ASGC wins $27.7m Phase 2 of Arada’s SABIS International School at Aljada appeared first on Construction Week Online.
Source: New feed