Engineering firm inked confidential settlements with four child plaintiffs ahead of a February retrial in the case over the 2014-2015 Flint, Mich., lead-in-water crisis.
Source: New feed
Engineering firm inked confidential settlements with four child plaintiffs ahead of a February retrial in the case over the 2014-2015 Flint, Mich., lead-in-water crisis.
Source: New feed