The Dept. of Energy continued its campaign to halt construction of the multibillion-dollar Mixed Oxide Fuel Fabrication Facility project, often referred to as MOX, this time by pointing out construction errors and defects during a Sept. 8 media tour of the Savannah River Site facility.
Source: New feed