The contractors are repairing Apra Harbor’s Glass Breakwater, which was damaged by a typhoon and at risk of breach.
Source: New feed
The contractors are repairing Apra Harbor’s Glass Breakwater, which was damaged by a typhoon and at risk of breach.
Source: New feed
The $295M project will be built by PCL and Sundt.
Source: New feed
Chicago City Council has approved a plan to borrow $830 million for repairs and upgrades to the city’s transportation infrastructure.
Source: New feed
Firms will construct plants in undisclosed locations in Texas and the mid-Atlantic region, with the first 1.2-GW facility set to operate in 2029, but no project investment total was disclosed.
Source: New feed
After 28 years at Autodesk, including the last six as senior vice president and general manager of Autodesk Construction Solutions, Jim Lynch has said he will retire from the architecture, engineering and construction software provider effective April 1 and hand the reins of the group to executive vice president of AEC Solutions, Amy Bunszel.
Source: New feed
ENR’s 20-city average cost indexes, wages and materials prices. Historical data and details for ENR’s 20 cities can be found at ENR.com/economics
Source: New feed
Raises peaked in 2023, but remain high compared to pre-pandemic levels.
Source: New feed
Concerns over tariffs will factor heavily as the year continues.
Source: New feed
Materials prices are expected to rise in the face of tariffs.
Source: New feed
The Chicago-based materials supplier cites a growing demand in the sector for low-embodied carbon building materials.
Source: New feed