PCL and Stantec Picked for Expansion of San Diego Plant to Deal With Tijuana Wastewater Flows

PCL Construction secures a $42-million progressive design-build contract to expand San Diego’s South Bay International Wastewater Treatment plant, the first contract in an overall $600 million project to treat wastewater flows that have been crossing the border with Mexico since 2022. 

Source: New feed


Leave a Reply