Award of Merit Highway/Bridge: Bunker Creek ABC Bridge Replacement

While replacing the existing 15-ft-long concrete slab bridge for this $7.2-million project, the team faced challenges that included compressible soils and tidal conditions. Because a sealed cofferdam was not employed, all work was conducted during 8-ft tidal cycles.

Source: New feed


Leave a Reply