A note from the engineer of record on an approved shop drawing for San Francisco’s Salesforce Transit Center appears to have initiated an instruction to the steel fabricator to cut two 2-in. x 4-in. holes in the bottom flanges of the hub’s built-up plate girders.
Source: New feed